Warsaw WWTP
Maumee Tainter Gate
Eagle Creek Dam Improvements

Projects

Warsaw WWTP

Construction of a new Lab Building at the Warsaw Wastewater Treatment Plant.

Location: Warsaw, IN

Purdue Wade Utility Power Plant Coal Conveyor Installation

Installation of a new coal conveyor, coal chutes, ductwork, sensors, electrical and control systems in order to feed coal to Boiler No. 5 at the Wade Utility Power Plant.

Located at Purdue University West Lafayette, IN

Maumee Tainter Gate

Removal and disposal of existing 9 FT X 25 FT Tainter gate and hoisting system, installation of a new Tainter gate and hoisting mechanism.

Located on the Maumee River in Fort Wayne, IN

Lake Dalecarlia WWTP

Construction of a new 100,000 GPD wastewater treatment plant including furnishing and installation of a new aeration blower system, UV Disinfection system, Anaerobic Digester, Flow Metering Equipment, Post Aeration Equipment and all associated site work, piping, chemical feed systems, electrical, mechanical, and control systems.

Located in Lowell, IN

Harrison Square Stormwater Pumping Station

Installation of a Stormwater Pumping Station including furnishing and installation of all Pumping Equipment, Piping, Valves, Electrical, Control Systems, Telemetry Systems, and all Associated Site Work. This project also includes new retaining walls, Field Access Ramp and Pedestrian Bridge.

Located at Parkview Stadium in Downtown Fort Wayne, IN

Harrison Square Skybridge

Construction of an enclosed Skybridge connecting the Embassy Theatre and the Courtyard by Marriot.

Located in Downtown Fort Wayne, IN

Eagle Creek Dam Improvements

Upgrades to the Control Building and Meter House at the Eagle Creek Dam.

Located in Indianapolis, IN

Town of Churubusco

New Water Treatment Plant

The plant is capable of treating 250,000 Gallons per day and is equipped with Tonka Filtration Equipment.

Located in Churubusco, IN

Ashley Water Treatment Plant

Construction of a new 600 gpm water treatment plant including the furnishing and installation of new aeration and filtration equipment, concrete detention basin, high service pumps, raw and finished water piping, and all associated site work, piping, chemical feed systems, electrical, mechanical, and control systems.

Located in Town of Ashley, IN

Anderson WWTP Forcemain Overflow Structure

Construction of a 40 foot tall Concrete Influent Overflow Structure.

Located at the Anderson Wastewater Treatment Plant in Anderson, IN

Michigan Rd. Secondary Clarifier

Construction of a 70-foot Diameter Secondary Clarifier at the Clay Township Regional Waste District Michigan Rd. Wastewater Treatment Plant.

Located in Zionsville, IN

Highland Creek Stormwater Diversion Structure - City of Indianapolis

The project redirects Stormwater from Highland Creek to the White River using a combination of box culverts, stormwater pipe and diversion structures to provide relief from flooding downstream. A manmade wetland has also been constructed to improve stormwater quality.

Located in Indianapolis, IN

Gerig-Ottenweller Contracting, LLC.
3010 Independence Drive
Fort Wayne, IN 46808
PH: (260) 484-9183
FX: (260) 484-9187
Email: info@gocllc.com